Dubbo Regional Rail Maintenance Facility
– CPB

  • Realignment and Resignalling of Dubbo East Junction
  • Installation of new Maintenance Facility for the TfNSW Regional Rail Fleet
  • Rail Systems Management and Commissioning Management

ARTC LCIP Project – Wabtec

  • 9 Level Crossing Upgrades (Relay. CBI & GCP) across NSW
  • Cerberus Data Design
  • Principles Testing for interlocked level crossings
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Mt Pleasant Balloon Loop 2 Project – Daracon / Wabtec

  • Installation of new Balloon Loop for Mt Pleasant Mine
  • Removal of existing redundant loop

North Eastern Rail Line Project – Wabtec

  • Installation of 2 x new interlockings in section between Benalla and Seymour
  • Provision of Signalling Resources
  • Slide title

    Write your caption here
    Button

QUBE / JMDR

  • Moorebank Intermodal Terminal – Signal Maintenance Management

South Australia Dual Gauge Removal Stage 3 – Wabtec

  • Removal of Dual Gauge Systems between Gillman Junction and Outer Harbour
  • Signalling Commissioning Management
  • Provision of Signalling Resources
  • Principles Testing of Microlok II Interlockings

Merrygoen Ground Frame Replacement

  • Replacement expired 10 lever mechanical ground frame with 2 x new frames
  • Signalling Commissioning Management
  • Signalling Mechanical Installation
  • Provision of Signalling Resources

Botany Rail Line Duplication – Aurecon / ARTC

  • Project Signalling Independent Verifier for Major Construction Works

Cabramatta Passing Loop – Aurecon / ARTC

  • Project Signalling Independent Verifier for Major Construction Works

Recently Completed Projects.

We also recently completed the following projects, with successful results and happy clients.

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

Wallendbeen Line Route Replacement – Woods Signalling

  • Undergrounding of Line Route Section to enable works for Burley GriffinWay Bridge Replacement
  • Design of Cable Route Replacement works
  • Review and Approval of Signalling Documentation
  • Testing and Commissioning of altered arrangement

ARTC Points Upgrade package – 2019 / 2020 – JHG

  • 18 Points Replacements across various areas of ARTC Network

Inland Rail – Parkes to Narromine – InLink

  • Provision of Signal Testing Resources
  • Creation of Signalling Works Packages for all sections (12 packages in total)
  • Creation of Microlok Test Data

ARTC LCIP Project – Aldridge

  • Creation of Signalling Works Packages for 6 Level Crossings

Sydney Trains Asset Condition Survey – Minto to Macarthur – WSP

  • Asset Condition Survey and options report form areas between Minto and Macarthur

Mount Murray Loop Extension Stage 1 & 2 – JHG

  • Enabling and Extension of Mount Murray Passing Loop
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Chullora Junction Remodelling Stages 1 to 4 – JHG

  • Replacement and remodelling of Chullora Junction and access to Boshop
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Army Road Level Crossing Upgrade – Wabtec

  • Upgrade of existing Lights and Bells with new Boom gates including resignalling of section between Saxonvale and Whittingham Junction
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Port Waratah B3 Location replacement – Wabtec / ARTC

  • Replacement of life expired B3 Location and cable routes at Port Waratah
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Mangoola replacement of Vital Radio Links – Wabtec / ARTC

  • Replacement of Microlok Vital Radio Systems with new Tranzeo Raido
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Provision of Auto-Bypass systems for UPS (various locations) – Wabtec / ARTC

  • Installation of Auto-Bypass systems for UPS
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Generator Replacement at Kankool – Wabtec / ARTC

  • Replacement of life expired Generator and ECO
  • Signalling Commissioning Management
  • Provision of Signalling Resources

Contact the Team Today.

   For more information on our current or past projects, or to talk to one of our engineers, please reach out.

Contact Us
Share by: