Current Projects.
Dubbo Regional Rail Maintenance Facility
– CPB
- Realignment and Resignalling of Dubbo East Junction
- Installation of new Maintenance Facility for the TfNSW Regional Rail Fleet
- Rail Systems Management and Commissioning Management
ARTC LCIP Project – Wabtec
- 9 Level Crossing Upgrades (Relay. CBI & GCP) across NSW
- Cerberus Data Design
- Principles Testing for interlocked level crossings
Mt Pleasant Balloon Loop 2 Project – Daracon / Wabtec
- Installation of new Balloon Loop for Mt Pleasant Mine
- Removal of existing redundant loop
North Eastern Rail Line Project – Wabtec
- Installation of 2 x new interlockings in section between Benalla and Seymour
- Provision of Signalling Resources
QUBE / JMDR
- Moorebank Intermodal Terminal – Signal Maintenance Management
South Australia Dual Gauge Removal Stage 3 – Wabtec
- Removal of Dual Gauge Systems between Gillman Junction and Outer Harbour
- Signalling Commissioning Management
- Provision of Signalling Resources
- Principles Testing of Microlok II Interlockings
Merrygoen Ground Frame Replacement
- Replacement expired 10 lever mechanical ground frame with 2 x new frames
- Signalling Commissioning Management
- Signalling Mechanical Installation
- Provision of Signalling Resources
Botany Rail Line Duplication – Aurecon / ARTC
- Project Signalling Independent Verifier for Major Construction Works
Cabramatta Passing Loop – Aurecon / ARTC
- Project Signalling Independent Verifier for Major Construction Works
Recently Completed Projects.
We also recently completed the following projects, with successful results and happy clients.
Wallendbeen Line Route Replacement – Woods Signalling
- Undergrounding of Line Route Section to enable works for Burley GriffinWay Bridge Replacement
- Design of Cable Route Replacement works
- Review and Approval of Signalling Documentation
- Testing and Commissioning of altered arrangement
ARTC Points Upgrade package – 2019 / 2020 – JHG
- 18 Points Replacements across various areas of ARTC Network
Inland Rail – Parkes to Narromine – InLink
- Provision of Signal Testing Resources
- Creation of Signalling Works Packages for all sections (12 packages in total)
- Creation of Microlok Test Data
ARTC LCIP Project – Aldridge
- Creation of Signalling Works Packages for 6 Level Crossings
Sydney Trains Asset Condition Survey – Minto to Macarthur – WSP
- Asset Condition Survey and options report form areas between Minto and Macarthur
Mount Murray Loop Extension Stage 1 & 2 – JHG
- Enabling and Extension of Mount Murray Passing Loop
- Signalling Commissioning Management
- Provision of Signalling Resources
Chullora Junction Remodelling Stages 1 to 4 – JHG
- Replacement and remodelling of Chullora Junction and access to Boshop
- Signalling Commissioning Management
- Provision of Signalling Resources
Army Road Level Crossing Upgrade – Wabtec
- Upgrade of existing Lights and Bells with new Boom gates including resignalling of section between Saxonvale and Whittingham Junction
- Signalling Commissioning Management
- Provision of Signalling Resources
Port Waratah B3 Location replacement – Wabtec / ARTC
- Replacement of life expired B3 Location and cable routes at Port Waratah
- Signalling Commissioning Management
- Provision of Signalling Resources
Mangoola replacement of Vital Radio Links – Wabtec / ARTC
- Replacement of Microlok Vital Radio Systems with new Tranzeo Raido
- Signalling Commissioning Management
- Provision of Signalling Resources
Provision of Auto-Bypass systems for UPS (various locations) – Wabtec / ARTC
- Installation of Auto-Bypass systems for UPS
- Signalling Commissioning Management
- Provision of Signalling Resources
Generator Replacement at Kankool – Wabtec / ARTC
- Replacement of life expired Generator and ECO
- Signalling Commissioning Management
- Provision of Signalling Resources